Easter Holiday

In observance of the Easter holiday, Dixon offices will be closed on Friday, March 29th. Normal office hours will resume on Monday, April 1st. 

The following distribution locations will be open: California, Chicago, Houston, Ohio, Maryland, North Carolina, Wisconsin.

Thank you and have a great holiday weekend!

Image

FFS-RSCC - Residential Sprinkler Control Cabinets

FFS-RSCC
Dixon Distributor? 

Log in to view pricing, inventory, place orders & much more. If you want to create an account, please click the button to begin the registration process.

Attributes

Optional Package/Box Quantity
1

Details

Construction

  • Main Stop Valve: Bronze Monitored DN50 (fivalco UL-FM approved)
  • Check Valve: DN50 Soft Seat check valve- epoxy coated ductile iron
  • Test & Drain Valve: Lockable- complete with 003 padlock
  • Flow Switch: Potter Model UL FM approved
  • Pipe Work: Galvanized roll grooved pipe to AS4118 2.1

Features

  • Security Lockable cabinet door is fitted with a 003 Fire Industry common key and break glass key holder. Service book holder incorporated in door.
  • Provision for six spare sprinkler heads with cabinet

Installation

  • The incoming and outgoing pipe connections are DN50 (60.3mm OD) roll grooved mechanical couplings. Various adaptors are available to connect to different pipe sizes and pipe types.
  • The cabinet can be fitted between the wall studs or surface mounted.
  • The authority having jurisdiction may require the cabinet to be located in a highly visible position.
  • Water pressure and flow rates should be confirmed as adequate.
  • The test and drain line must be piped to waste. Electrical connections to be installed and tested by authorised personnel.

Instructions

  • Each Section can be dismantled by authorised service personnel should any service be required. Components requiring service can be removed and replaced or serviced on site.
  • Advise the local authority that the system is being shut down for servicing
  • Dismantling of electrical connections should be performed by qualified personnel
  • Shut down water supply from my supply
  • Shut down monitored valve from cabinet. Dismantle the roll groove coupling or the mechanical tee to test and drain. The couplings can be re-used take care when removing.
  • Drain down water from system at test and drain valve.
  • Alternative: Complete cabinet can be removed.

Note

All components are available and can be supplied ex-stock.

Specifications

Pressure tested to 2100 kPa

    Request a Quote

    Need help selecting the correct components?